Highway Care assist with Olympic Route upgrade
Monday, 30 Jan 2012
Birse Civils Eastern region choose Highway Care Ltd to supply and Install 6.1km of BarrierGuard for their M4 Datchet project.
BarrierGuard was installed to protect the workforce whilst work took place on upgrading existing drainage and safety barrie...
BarrierGuard Wheeled perfect fit for tight squeeze bridge project
Friday, 09 Dec 2011
Highway Care’s BarrierGuard Wheeled seemed the perfect fit recently when EnterpriseMouchel – Highways Agency Area 13 were tackling the A66 Stainton Underbridge project. Barrier protection was required to protect scaffolding while copings ...
Highway Care add two new standards to portfolio
Friday, 18 Nov 2011
In addition to ISO 9001:2008 Highway Care Ltd is pleased to announce that we have recently gained certification for both ISO 14001:2004 and OHSAS 18001:2007.
Highway Care is committed to minimising the impact of it’s operations on the ...
Highway Care launches Customer Survey and supports Road Safety Week
Wednesday, 16 Nov 2011
Highway Care are launching a short Customer Satisfaction Survey and for each completed survey, Highway Care have pledged their support to UK Road Safety Week and will be donating money to the charity. The survey will be sent to all customers within t...
Double Sided Xtensions installed along M40
Date: 26/08/2010
Two Double Sided Xtension 110 P4 Terminals have been installed along the M40 by Oakdale Fencing. The Double Sided Xtension provides a safety termination for where two barrier runs need to be terminated as an alternative to conventional double ramped end.
The Double Sided Xtension is approved for use on Highways Agency roads and can be used without a ‘Departure from Standard’. The system can be connected directly to W-beam barrier systems of N2 containment and W2 working width and requires fewer parts to other similar systems which allows for speedy installation, low repair costs and therefore lower lifetime costs.