Charlie ready for Brands GP for CHALLENGE
Friday, 04 Aug 2017
  Charlie Butler-Henderson is confident that his mid-season troubles are behind him and that he can continue his climb up the MINI CHALLENGE JCW Championship table on the legendary Brands Hatch Grand Prix...
Click here to read more



Light Arrow History, Development & Trust
Wednesday, 19 Jul 2017
Check out the latest InfoGraphic from Highway Care the leading innovator of Light Arrows.  
Click here to read more



Customer Testimonials

 

BarrierGuard 800 Protection at Bournemouth Wheels Festival

Date: 01/07/2016
  In 2015, Bournemouth Borough Council set out to nd a barrier that will protect the hundreds of thousand visitors to their town while limiting further disruption to trffiac in the build-up and demolish of their annual motor festi...
 

BarrierGuard Wheeled perfect for A66 Stainton Underbridge project

Date: 26/06/2012
“The site in question is an underpass with limited width and available site length as well as other restrictions. Barrier had been specified as protection to access scaffold, due to the site limitations it would have been difficult to install c...
 

BarrierGuard installed on M23

Date: 14/11/2011
  “On all aspects of this project Highway Care have proven themselves to be a very reliable and efficient supplier of temporary barrier, the installation took place over 4 shifts as scheduled which enabled us to keep to our project de...
 

TAU Crash Cushions installed on the N25 Suir Bridge Plaza

Date: 12/11/2010
“As the operators of the N25 Suir Bridge Plaza and project road, SouthLink N25 Ltd are very pleased with both the performance and ease of repair of the TAU crash cushions installed on the scheme. We are particularly pleased with the level of ...
 

BarrierGuard N2 W2 installed on A12 Colchester

Date: 28/06/2010
“We were very pleased with the efficient service we received from Highway Care. The installations were carried out quickly, while the technical assistance was also very helpful.” Carillion Civil Engineering
 

BarrierGuard Used on M27 Widening

Date: 13/02/2009
“Highway Care’s BarrierGuard was chosen for this particular scheme due to our requirement for a time and cost efficient temporary barrier solution.  Within two weeks of receiving instruction from Costain, Highway Care was on si...
 

BikeGuard installed along A54 Macclesfield Road Derbyshire

Date: 12/02/2009
“With BikeGuard in place, it is intended that if motorcycle riders were to lose control along this stretch of the A54, the severity of any injuries sustained would be greatly reduced.” Steve Dungworth, Senior Technician Highways, De...
 

BikeGuard installed along A537 Cat & Fiddle

Date: 12/02/2009
“During the summer, groups of motorcyclists ride to the Cat & Fiddle pub and effectively use the A537 as a ‘race track’ as the route is considered to be quite challenging in places.  Motorcyclists on the A537 make up le...
 

TreeFend Hazard Impact Protection System installed at Chester-le-Street County Durham

Date: 12/02/2009
  “We are always looking for practical and innovative solutions where site restrictions mean we cannot use traditional methods of road safety construction.  In this case, as the tree was protected and on the line of the proposed fu...
 

BikeGuard installed along A379 in Devon

Date: 12/02/2009
“In recent years there had been a number of serious collisions along this particular section of the A379. Motorcyclists were losing control on the long, tight curvature of the bend which links the M5 and Exeter. Detailed examination of the ci...