BarrierGuard Wheeled Underbridge Testimonial

Highway Care teams up with Aftercare Response to offer industry-leading back-up
Tuesday, 30 Jan 2018
  Operators of road maintenance and traffic management vehicles equipped with safety systems by sector specialist Highway Care can now take advantage of...
Click here to read more



Winter Packs for Highway Care
Friday, 15 Dec 2017
    Detling Operatives are keen to see what is in their bag The snow fell thick and fast last week and although the weather may have beat u...
Click here to read more



BarrierGuard Wheeled perfect for A66 Stainton Underbridge project

Date: 26/06/2012

“The site in question is an underpass with limited width and available site length as well as other restrictions. Barrier had been specified as protection to access scaffold, due to the site limitations it would have been difficult to install conventional systems. The ability to offload then push BarrierGuard Wheeled into place was advantageous at this location.The installation was completed quickly and with minimal disruption to traffic” commented an EnterpriseMouchel engineer.BarrierGuard_bridge_project_web_picture.JPG

Highway Care’s BarrierGuard Wheeled was the perfect fit when EnterpriseMouchel – Highways Agency Area 13 were tackling the A66 Stainton Underbridge project. Barrier protection was required to protect scaffolding while copings on the bridge were replaced, but the headroom was too low to allow the use of a crane. EnterpriseMouchel could not find any other barrier with an equivalent performance which could be easily installed without a crane or forklift.
 
 